Plum Perfect Pools letters.gif (1498 bytes)
For sales and service call (631) 395-4105

Want to contact us? Call 631.289.POOL (7665) 
E-mail: info@plumperfectpools.com

 

 

The pool is completely filled now. At this point the electrical work is finished, the equipment is installed and we're ready to give the pool life! Once the pool's operating system is started, stabilizer is added to the water and the sanitation process begins. Although the water is a little chilly, tommorrow the pool can be used. Depending on the mason contractor you hire, they might be able to begin the deckwork around the pool at this stage. They will prepare and tamp down the ground around the pool to prevent settling after the deck is put down. Some customers opt to let the ground settle around the pool for a few months before contracting the masons to do the work.

Pool_After_liner.GIF (276689 bytes)

<back to pictures page>

 

 

 

Hit Counter